Who Pays for Data Centers
HomeWater › Colorado River

Arizona, the Colorado River and the data centers

The federal cut, the facility numbers, and the ratio between them · guidelines issued August 21, 2026

Arizona is giving up more Colorado River water than any other state at the same time as it is approving data centers. Both things are true, and the question that follows is an arithmetic one that almost nobody publishes: how much of the cut is the data centers?

The cut, as the guidelines write it

StateApportioned, 2027 and 2028ReductionReduction in gallons
Arizona2.04 maf760,000 af247.65 billion gallons
California3.96 maf440,000 af143.37 billion gallons
Nevada250,000 af50,000 af16.29 billion gallons
Of the 6.25 maf that shall be apportioned each calendar year for consumptive use in the Lower Division States of which 2.04 maf shall be apportioned for use in Arizona, 3.96 maf shall be apportioned for use in California and 250,000 acre-feet (af) shall be apportioned for use in Nevada, reflecting reductions of 760,000 af in Arizona, 440,000 af in California, and 50,000 af in Nevada

Source: Bureau of Reclamation, Colorado River Guidelines for Coordinated Operations of Lake Powell and Lake Mead, Operating Years 2027 and 2028 (August 2026)

How the data centers compare

Set the two numbers side by side. Arizona surrenders 760,000 acre-feet a year. Phoenix data centers are estimated to use 1,182 acre-feet a year today, and are projected toward 11,662 acre-feet. That is 0.16% of the cut now and 1.5% at the projection.

Both readings of that arithmetic are honest, and they point in opposite directions. Data centers are not what is draining the Colorado River: the cut is an order of magnitude larger than the entire Phoenix data-center industry, and agriculture uses about 72% of Arizona's water. But data-center demand is the fastest-growing new industrial draw in the state, it is concentrated in specific municipal systems rather than spread across the state, and unlike a farm it is an industry with a genuine choice about which state it builds in.

The projection above is the source's, not ours. This site publishes no forecasts of its own; see about and methodology.

What Arizona has actually done about it

The electricity side of the same bill

A data center's water shows up twice: once in its cooling and again, roughly 12 times over, at the power plants that supply it. Arizona's electricity picture, including the rate cases now before the Corporation Commission, is on the Arizona electricity page, and the water arithmetic for a given facility size is on the water hub.

Download the cuts (CSV) · Facility figures → · Arizona electricity →